About Us

INTRODUCTION

BAWAR OFFICE was registered in the Iraqi Engineering Union as a design and consulting office under registration number “647” on 10/03/2003. The main office is in Baghdad, and there is a branch office in Erbil.

BAWAR OFFICE specializes in the following fields:

1- Design and survey railway alignments.

2- Design of station layout and marshaling yards.

3- Design of culverts, bridges, and making the hydrology study.

4- Design of station buildings, industrial buildings, and stores.

5- fixing specifications of permanent way materials like (rails, fastenings, etc …)

6- Feasibility study of railway alignment.

7- Constructions.

8- Management of contracts.

Cons. Eng. Burhanuldeen M. Mirani

B.S.C. in civil engineering Basrah university 1968

1968 – 1970

Working with a contractor for construction of warehouses and administration building for Tobacco office in Ranyah – Sulaymaniyah – Iraq.

1970 – 1976

Working with Iraqi republic railway company as a district engineer for constructing and maintenance of railway lines in Samara – Iraq.

1976 – 1996

Chief of design department of railway lines of Iraqi Railway Company with the following responsibilities:

  1. Updating the design of Baghdad marshalling yard.
  2. Design railway network for ten berths in Basrah.
  3. Design branch line to the steel factory in Basrah.
  4. Design of the branch line to the oil refinery in Bejey including the railway network in the refinery, length (15) km.
  5. Design branch line to the compost factory in Bejey length 12 km.
  6. Design branch line to the military barracks total length (120) km.
  7. Arranging specification of all railway line materials like rails, fastening, sleepers, turnouts…etc.

8. Having a course of training for three months in Japan in 1984 in urban transportation including railway lines , metro , and monorails

9. Having a course of training for three months in England in design of railway lines at 1989.

10.Research in maintenance in railway lines published in Arab railway magazine at 1988.

2003 – 2011

Establishment of a design office (Bawar Office) for design of all civil engineering works especially railway lines.

1. 2003 – 2004

working as a sub-contractor with Iraqi engineer union consulting bureau for preliminary and detail design of high speed railway line between Ishaqi and Imam – dor , the railway line is a double line the length is (40) km including three station2003 -2011

2. 2003 -2011

A. Partnership with Czech design companies and having a contract with the ministry of transport – the state company for implementation of transport projects for consultancy services surveying updating design and documents of Baghdad – Kirkuk – Erbil – Mosul railway line.

  • The total length of the main line is (700) km includes stations buildings, civil buildings , industrial buildings , good sheds , marshaling yards.. etc

B. partnership with Czech companies and having a contract with Iraqi Republic railway company for updating the design of railway line Mosul – Duhok – Zakho including the feasibility study.

  • Total length of the main line is about 150 km includes stations buildings, civil buildings , industrial buildings , good sheds , marshaling yards.. etc